Tudor Gold Intersects 70.96 g/t AuEq over 1.0 m Within 39.15 g/t AuEq over 2.0 m with a 225 m Northeast Step-Out Hole from the 2021 Drilling at the Goldstorm Deposit
Ken Konkin, President and CEO, comments, “We are extremely pleased to report this second consecutive high-grade, visible gold intercept from our northeastern step-out drilling. This 70.96 g/t AuEQ intercept over one meter is now highest single gold grade intercept of the project. The unique aspect of the two-meter composite of 39.15 g/t AuEQ and the 4.5 meter visible gold composite from GS-22-134 that averaged 20.86 g/t AuEQ is that they both appear to have similar modes of occurrence that resembles the gold mineralization at the Valley of Kings (VOK) Deposit at Newcrest’s Brucejack Lake Mine adjacent to our southern border. Most of the free-gold mineralization at the Goldstorm Deposit is associated with quartz-pyrite veinlets but it also appears as fine disseminated grains of free visible gold within host rock as observed in this high-grade intercept within GS-22-143. This may be a colloidal-type mineralization which is also observed at the Brucejack Lake Mine. Gold mineralization at the VOK Deposit occurs as electrum, however the visible gold found at the Goldstorm Deposit occurs as native gold. As with the discovery of R-66 to the southeast, these new high-grade gold intercepts may be completely different pulses of mineralization that can occur outside the known limits of the porphyry style of gold mineralization. Clearly more drilling is required to better understand the grade distribution and consistency within the northeastern portion of the Goldstorm Deposit.”
The Program at the Treaty Creek property includes an aggressive resource expansion and delineation plan on several areas including the Goldstorm Deposit and the Eureka and Calm Before the Storm zones. Results included in this press release include preliminary results from one diamond drill hole from the Goldstorm Deposit that was targeted outside the 2021 mineral resource area (see link: corresponding Treaty Creek plan map and sections).
GOLDSTORM DEPOSIT
SECTION B
- GS-22-143 stepped out 225 m to the northeast from the 2021 drilling and targeted 300H and CS600 mineralization. A high-grade interval of 39.15 g/t AuEQ over 2.0 m was intercepted in an area that spatially lines up with the 300H mineral domain, however, is interpreted as potentially being a separate mineralization event. Visible gold was found hosted within the fabric of the host rock.
Qualified Person
The Qualified Person for this news release for the purposes of National Instrument 43-101 is the Company’s President and CEO, Ken Konkin, P.Geo. He has read and approved the scientific and technical information that forms the basis for the disclosure contained in this news release.
QA/QC
Diamond drill core samples were prepared at MSA Labs’ Preparation Laboratory in Terrace, BC and assayed at MSA Labs’ Geochemical Laboratory in Langley, BC. Analytical accuracy and precision are monitored by the submission of blanks, certified standards and duplicate samples inserted at regular intervals into the sample stream by Tudor Gold personnel. MSA Laboratories quality system complies with the requirements for the International Standards ISO 17025 and ISO 9001. MSA Labs is independent of the Company.
About Tudor Gold
TUDOR GOLD Corp. is a precious and base metals exploration and development company with properties in British Columbia’s Golden Triangle (Canada), an area that hosts producing and past-producing mines and several large deposits that are approaching potential development. The 17,913 hectare Treaty Creek project (in which TUDOR GOLD has a 60% interest) borders Seabridge Gold Inc.’s KSM property to the southwest and borders Newcrest Mining Limited’s Brucejack property to the southeast. In April 2021 Tudor published their 43-101 technical report, “Technical Report and Initial Mineral Resource Estimate of the Treaty Creek Gold Property, Skeena Mining Division, British Columbia Canada” dated March 1, 2021, on the Company’s Sedar profile. The Company also has a 100% interest in the Crown project and a 100% interest in the Eskay North project, all located in the Golden Triangle area.
ON BEHALF OF THE BOARD OF DIRECTORS OF
TUDOR GOLD CORP.
"Ken Konkin"
Ken Konkin
President and Chief Executive Officer
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Statements regarding Forward-Looking Information
This news release contains “forward-looking information” within the meaning of applicable Canadian securities legislation. “Forward-looking information” includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including the completion and anticipated results of planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative connation thereof.
Such forward-looking information and statements are based on numerous assumptions, including among others, that the Company’s planned exploration activities will be completed in a timely manner. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate.
There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company’s plans or expectations include risks relating to the actual results of current exploration activities, fluctuating gold prices, possibility of equipment breakdowns and delays, exploration cost overruns, availability of capital and financing, general economic, market or business conditions, regulatory changes, timeliness of government or regulatory approvals and other risks detailed herein and from time to time in the filings made by the Company with securities regulators.
Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.
The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.
Swiss Resource Capital AG
Poststrasse 1
CH9100 Herisau
Telefon: +41 (71) 354-8501
Telefax: +41 (71) 560-4271
http://www.resource-capital.ch
Head of Corporate Development and Communications
Telefon: +49 (604) 559-8092
E-Mail: chris.curran@tudor-gold.com
Head of Investor Relations and Communications
Telefon: +49 (151) 55362000
E-Mail: carsten.ringler@tudor-gold.com
CEO
Telefon: +41 (71) 3548501
E-Mail: js@resource-capital.ch