Maple Gold secures third drill rig to commence phase III drilling at Eagle and remains on track to complete 30,000 metres across its Quebec project portfolio by year-end
The Company is also pleased to announce that it has resolved the electrical issues at site that affected its core saws, effectively removing its core cutting backlog and enabling several large batches of samples from previously completed drilling to be sent to the assay labs.
“We are excited to commence Phase III drilling at Eagle that will follow up on the best results of the first two drilling phases and test additional targets while we are also ramping up the pace of our supplemental C$4.8M deep drilling program at Douay and Joutel,” stated Matthew Hornor, President and CEO of Maple Gold. “With normal site operations now restored, our backlog of core splitting and sample shipments has been effectively eliminated and we anticipate additional assay results throughout Q4 2022. The Company expects to be continuously drilling more aggressive step-out and deep drill holes at Douay, Joutel and Eagle with at least three rigs from mid-October through the end of Q1 2023.”
Deep Drilling Progress
Deep drilling at Telbel is progressing steadily with two (2) drill rigs actively testing the down-plunge continuity of gold mineralization in this area. Drill hole TB-22-001 (drilled from south to north) is approaching 1,500 m downhole and has encountered a broad near-surface zone of felsic-pyroclastic-hosted pyrite mineralization enroute to a planned total downhole depth of 2,000 m (see Figure 1 for all drill hole locations). Initial samples from TB-22-001 have already been shipped to the assay lab. Drill hole TB-22-002 (drilled from north to south) is collared 2.4 km to the east of TB-22-001 and is currently nearing 900 m downhole.
In addition, the Company anticipates commencing a ~10,000 m deep drilling program at Douay with a fourth drill rig in November. The JV has approved a combined ~16,000 m of deep drilling at Douay and Telbel under the previously announced C$4.8M increase to its Year Two exploration budget (see news from May 18, 2022).
New Exploration Drillhole Completed at Douay
The Company has also recently completed a new 534 m exploration drill hole at Douay (DO-22-330) collared approximately four (4) km south of the 531 Zone along the regional Casa Berardi South Fault, locally known as the Joutel Deformation Zone ("JDZ") (see Figure 1). The JDZ has seen very limited drilling to-date in this area, with only a single historical drill hole over a nine (9) km segment of this structural corridor. The Company’s recently completed airborne magnetic and electromagnetic ("Mag-EM") survey identified several conductive targets along trend to the southwest on the Joutel property (see news from July 19, 2022) providing further support for the JDZ as a favourable structural corridor for hosting gold mineralization. Initial drill core observations from DO-22-330 highlight the potential for Casa-Berardi style gold mineralization associated with brecciated and pyritic quartz veins in graphitic fault zones.
Qualified Person
The scientific and technical data contained in this press release was reviewed and prepared under the supervision of Fred Speidel, M. Sc., P. Geo., Vice-President Exploration of Maple Gold. Mr. Speidel is a Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects. Mr. Speidel has verified the data related to the exploration information disclosed in this press release through his direct participation in the work.
About Maple Gold
Maple Gold Mines Ltd. is a Canadian advanced exploration company in a 50/50 joint venture with Agnico Eagle Mines Limited to jointly advance the district-scale Douay and Joutel gold projects located in Québec’s prolific Abitibi Greenstone Gold Belt. The projects benefit from exceptional infrastructure access and boast ~400 km2 of highly prospective ground including an established gold resource at Douay (SLR 2022) that holds significant expansion potential as well as the past-producing Eagle, Telbel and Eagle West mines at Joutel. In addition, the Company holds an exclusive option to acquire 100% of the Eagle Mine Property.
The district-scale property package also hosts a significant number of regional exploration targets along a 55 km strike length of the Casa Berardi Deformation Zone that have yet to be tested through drilling, making the project ripe for new gold and polymetallic discoveries. The Company is well capitalized and is currently focused on carrying out exploration and drill programs to grow resources and make new discoveries to establish an exciting new gold district in the heart of the Abitibi. For more information, please visit www.maplegoldmines.com.
ON BEHALF OF MAPLE GOLD MINES LTD.
"Matthew Hornor"
B. Matthew Hornor, President & CEO
For Further Information Please Contact:
Mr. Joness Lang
Executive Vice-President
Cell: 778.686.6836 Email: jlang@maplegoldmines.com
In Europe:
Swiss Resource Capital AG
Jochen Staiger
info@resource-capital.ch
www.resource-capital.ch
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS PRESS RELEASE.
Forward Looking Statements:
This press release contains "forward-looking information" and "forward-looking statements" (collectively referred to as "forward-looking statements") within the meaning of applicable Canadian securities legislation in Canada, including statements about exploration work and results from current and future work programs. Forward-looking statements are based on assumptions, uncertainties and management’s best estimate of future events. Actual events or results could differ materially from the Company’s expectations and projections. Investors are cautioned that forward-looking statements involve risks and uncertainties. Accordingly, readers should not place undue reliance on forward-looking statements. For a more detailed discussion of such risks and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements, refer to Maple Gold Mines Ltd.’s filings with Canadian securities regulators available on www.sedar.com or the Company’s website at www.maplegoldmines.com. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.
Swiss Resource Capital AG
Poststrasse 1
CH9100 Herisau
Telefon: +41 (71) 354-8501
Telefax: +41 (71) 560-4271
http://www.resource-capital.ch
CEO
Telefon: +41 (71) 3548501
E-Mail: js@resource-capital.ch