First Tin Plc („First Tin“ or „the Company“): The assay results from the first two drillholes at Tellerhauser
The two drillholes were designed to confirm results of previous drilling by Wismut during the 1970s that intersected high grade tin mineralisation at depth along strike from the known resources at the Tellerhauser project, and to increase the indicated resources.
The two areas tested are at depths of between 800m and 900m below surface and between 3,000m and 4,000m along strike from the Hämmerlein Indicated Resource area and 1,000m to 2,000m along strike from the Dreiberg Indicated Resource area.
The two drillholes intersected the targeted skarn zone and returned the following significant intercepts:
- Drillhole SAXDRE25:
- 5m from 805.7m downhole grading 0.75% Sn, 1.00% Zn, 33ppm In including:
- 6m @ 1.43% Sn, 1.99% Zn, 62ppm In from 806.0m downhole
- 5m from 805.7m downhole grading 0.75% Sn, 1.00% Zn, 33ppm In including:
- Drillhole SAXDRE34:
- 85m from 887m downhole grading 0.63% Sn, 1.29% Zn, 58ppm In including:
- 35m @ 1.49% Sn, 0.78% Zn, 122ppm In from 887,75m downhole
- 85m from 887m downhole grading 0.63% Sn, 1.29% Zn, 58ppm In including:
These intercepts confirm previous Wismut drilling from the 1970s and will form the basis for additional drilling designed to increase the Indicated Resource base at Tellerhäuser.
First Tin CEO Thomas Buenger said, “These initial drilling results from our deep drilling programme have confirmed the previous Wismut drilling and increased our confidence in the deep higher-grade mineralisation. We look forward to the results of the next two holes that are expected in January next year.”
Enquiries:
First Tin
Via SEC Newgate below
Thomas Buenger – Chief Executive Officer
Arlington Group Asset Management Limited (Financial Advisor and Joint Broker)
Simon Catt 020 7389 5016
WH Ireland Limited (Joint Broker)
Harry Ansell 020 7220 1670
SEC Newgate (Financial Communications)
Elisabeth Cowell / Axaule Shukanayeva / Molly Gretton 07900 248 213
In Europe:
Swiss Resource Capital AG
Jochen Staiger & Marc Ollinger
info@resource-capital.ch
www.resource-capital.ch
Notes to Editors
First Tin is an ethical, reliable, and sustainable tin production company led by a team of renowned tin specialists. The Company is focused on becoming a tin supplier in conflict-free, low political risk jurisdictions through the rapid development of high value, low capex tin assets in Germany and Australia.
Tin is a critical metal, vital in any plan to decarbonise and electrify the world, yet Europe has very little supply. Rising demand, together with shortages, is expected to lead tin to experience sustained deficit markets for the foreseeable future. Its assets have been de-risked significantly, with extensive work undertaken to date.
First Tin’s goal is to use best-in-class environmental standards to bring two tin mines into production in three years, providing provenance of supply to support the current global clean energy and technological revolutions.
Swiss Resource Capital AG
Poststrasse 1
CH9100 Herisau
Telefon: +41 (71) 354-8501
Telefax: +41 (71) 560-4271
http://www.resource-capital.ch
CEO
Telefon: +41 (71) 3548501
E-Mail: js@resource-capital.ch