Bauen & Wohnen

Perfect form and function: At Fontana Infinity, PASCHAL formwork solutions are fit for a king

Fontana Infinity rises up in the heart of Bahrain as a unique real estate project that not only offers luxurious living but also integrates world-class tourism facilities and services.

This ambitious project consists of two majestic towers – Tower A with 45 floors and Tower B with 46 floors – on a total built-up area of around 125,350 m².

Within the space separating the two towers is a tropical oasis with green gardens, a “lazy river” and an artificial beach, as well as Bahrain’s largest recreational swimming pool.

Kooheji Contractors, a long-time PASCHAL partner and one of the country’s leading project developers, took on the central role as main contractor in the implementation of this prestigious project.

Unbeatable formwork

To achieve the in-situ concrete structures, Kooheji Contractors once again relied on PASCHAL’s outstanding formwork solutions. PASCHAL’s formwork systems set the standard for successful construction projects in terms of speed, precision and cost-effectiveness.

In both towers, the lift cores, stairwells, shear walls and columns were formed with around 600 m² of modular/GE universal formwork and as a NeoR extension. This formwork system proved to allow extremely flexible implementation, especially in combination with other products

PASCHAL climbing brackets were used to form the external walls. 2,000 m² of PASCHAL Deck slab formwork were used for the concrete slabs of both towers.

Hand-in-hand to a masterpiece

The partnership with PASCHAL dates back to Kooheji Contractors’ early days as a construction company. Today, Fontana Infinity once again underscores the outstanding partnership between Kooheji Contractors as project developer and PASCHAL.

The fusion of innovative formwork technology and excellent construction management has contributed significantly to creating a new jewel of modern architecture that impressively combines luxury, comfort and design.

Firmenkontakt und Herausgeber der Meldung:

PASCHAL-Werk G. Maier GmbH
Kreuzbühlstr. 5
77790 Steinach
Telefon: +49 (7832) 71-0
Telefax: +49 (7832) 71-209
http://www.paschal.de

Ansprechpartner:
Katja Münch
PR
Telefon: +49 (7832) 71-237
E-Mail: katja.muench@paschal.de
Für die oben stehende Story ist allein der jeweils angegebene Herausgeber (siehe Firmenkontakt oben) verantwortlich. Dieser ist in der Regel auch Urheber des Pressetextes, sowie der angehängten Bild-, Ton-, Video-, Medien- und Informationsmaterialien. Die United News Network GmbH übernimmt keine Haftung für die Korrektheit oder Vollständigkeit der dargestellten Meldung. Auch bei Übertragungsfehlern oder anderen Störungen haftet sie nur im Fall von Vorsatz oder grober Fahrlässigkeit. Die Nutzung von hier archivierten Informationen zur Eigeninformation und redaktionellen Weiterverarbeitung ist in der Regel kostenfrei. Bitte klären Sie vor einer Weiterverwendung urheberrechtliche Fragen mit dem angegebenen Herausgeber. Eine systematische Speicherung dieser Daten sowie die Verwendung auch von Teilen dieses Datenbankwerks sind nur mit schriftlicher Genehmigung durch die United News Network GmbH gestattet.

counterpixel