Offshore Windmill farm connection to power grid: Rheinmetall clears explosive ordnances in Baltic Sea
The order to Rheinmetall was placed by grid operator 50Hertz within the OST-6-1 project and contains the detection of contaminations, their identi¬fication, the documentation, and hence, the recovery of explosive ordnances. Recovered trans¬portable contaminated waste and remains of weapons will be handed-over to the authorities or blown up on site.
This is the first major order for the Cooperation concerning offshore explosives ordnances detection and clearing. The offshore work to be carried out by Rheinmetall Project Solutions GmbH began in July 2024 and is expected to be completed in May 2025.
The commissioning underlines Rheinmetall’s expertise in the field of offshore explosive ordnance detection and safe clearance, in which all legal and environmental aspects are taken into account.
The aim is to clear the area in order to enable grid operator 50Hertz to lay offshore extra-high voltage cables and install two offshore platforms off the coast of the Fischland-Darß region. This project involves Rheinmetall AG being the project lead, alongside specialized companies from Germany and Norway.
Rheinmetall AG
Rheinmetall Platz 1
40476 Düsseldorf
Telefon: +49 (211) 473-01
Telefax: +49 (211) 473-4158
http://www.rheinmetall.com
Leiter Presse- und Öffentlichkeitsarbeit
Telefon: +49 (211) 473 47 48
Fax: +49 (211) 473 41 58
E-Mail: media@rheinmetall.com